Construction of gas distribution network completed in Avangard SEZ
December 24 2024

Construction of gas distribution network completed in SEZ Avangard
High pressure gas pipeline with total length of 3840 m
9 nodes and 3 shut-off devices were installed to connect residents along the entire length of the gas distribution network
Source