TsOD Okab LLC
August 4 2023
EDGE Data Processing Center in the Omsk region is a specialized facility, which is a connected system of IT infrastructure, engineering infrastructure, equipment and parts of which are located in a building connected to engineering and telecommunications networks.
Project cost: 309 million rubles
Plot area – 1 ha
TsOD Okab LLC
644010, Omsk region, Omsk, Martynova Boulevard, 17
General Director – Losevsky Konstantin Alexandrovich
info@omsk.mts.ru